Horoscope will be made of Bikaner road lights, data of switched off lights on every pole will be ready.

Bikaner News Desk: Coils of lights installed on electric poles in urban areas will be ready. In the ward-wise survey, information about the number of lights installed on each pole and the on and off lights will be collected. Besides, such electric poles will also be marked which do not have even a single road light installed on them. The corporation has also prepared a format for ward-wise survey of road lights. According to this format, information about road lights installed in all the wards will be collected. The order has been issued by Corporation Deputy Commissioner Yashpal Ahuja. It has been asked to complete the survey work in seven days. A team of all junior electrical engineers has been formed under the direction of Executive Engineer Electrical.

more than 50 thousand lights

The corporation has more than 50 thousand road lights in the urban area. According to Anil Kanwadiya, Executive Engineer (Electrical) of the corporation, according to the information received from BKESL, there are about 36 thousand electric poles in the urban area. Ward-wise survey work was done during the seven thousand road lights installed by the corporation in the year 2021-22. Now there will be a survey again.

The survey will be conducted in this format

Deputy Commissioner According to the format issued for the survey of road lights by the team, information about the lights installed on every electric pole of each ward located in the urban area, ward number, number of lights currently installed, total number of newly installed lights, current Information will be collected as per the number of defective lights and the current demand for new lights.

less time, more work

urban Only seven days have been set by the corporation administration for the survey work for the road lights installed on the electric poles in the area. Experts believe that survey work of thousands of poles and thousands of lights does not seem possible in seven days. The corporation administration will have to extend the time period for this, only then the actual situation on the ground will be revealed.

Leave a Comment

Read Next